Atıf Formatları
İnşaat Projelerinde Zaman Maliyet Ödünleşim Problemi: Örnek Olay Analizi
  • IEEE
  • ACM
  • APA
  • Chicago
  • MLA
  • Harvard
  • BibTeX

M. N. Uğural, "Time-Cost Trade-Off Analysis in a Construction Projects: Case Study," Avrupa Bilim ve Teknoloji Dergisi , vol.0, no.19, pp.460-465, 2020

Uğural, M. N. 2020. Time-Cost Trade-Off Analysis in a Construction Projects: Case Study. Avrupa Bilim ve Teknoloji Dergisi , vol.0, no.19 , 460-465.

Uğural, M. N., (2020). Time-Cost Trade-Off Analysis in a Construction Projects: Case Study. Avrupa Bilim ve Teknoloji Dergisi , vol.0, no.19, 460-465.

Uğural, MEHMET. "Time-Cost Trade-Off Analysis in a Construction Projects: Case Study," Avrupa Bilim ve Teknoloji Dergisi , vol.0, no.19, 460-465, 2020

Uğural, MEHMET N. . "Time-Cost Trade-Off Analysis in a Construction Projects: Case Study." Avrupa Bilim ve Teknoloji Dergisi , vol.0, no.19, pp.460-465, 2020

Uğural, M. N. (2020) . "Time-Cost Trade-Off Analysis in a Construction Projects: Case Study." Avrupa Bilim ve Teknoloji Dergisi , vol.0, no.19, pp.460-465.

@article{article, author={MEHMET NURETTİN UĞURAL}, title={Time-Cost Trade-Off Analysis in a Construction Projects: Case Study}, journal={Avrupa Bilim ve Teknoloji Dergisi}, year=2020, pages={460-465} }